Skip to content

Pull requests: openshift/origin

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

OCPBUGS-86763: Wait for namespace initialization before creating pod approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#31235 opened May 29, 2026 by openshift-cherrypick-robot Loading…
Add CodeRabbit instruction to prefer k8s sets over bespoke maps approved Indicates a PR has been approved by an approver from all required OWNERS files. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31234 opened May 29, 2026 by stbenjam Member Loading…
1 task
NO-ISSUE: Automated - Update synthetic test data jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#31233 opened May 29, 2026 by openshift-ci Bot Loading…
[release-4.21] Backport Gateway API upgrade test do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#31232 opened May 29, 2026 by gcs278 Contributor Draft
3 tasks
CORENET-7206: Register multus-cni OTE test extension binary jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#31231 opened May 28, 2026 by anuragthehatter Loading…
2 tasks
OCPNODE-4538: Add e2e tests for DRA Partitionable Devices (KEP-4815) do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#31230 opened May 28, 2026 by sabujmaity Contributor Draft
OCPNODE-4554: Automate OCP-70203: ICSP and IDMS/ITMS can coexist in cluster jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31229 opened May 28, 2026 by asahay19 Contributor Loading…
DNM/TEST: Test udn 10x serial do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#31227 opened May 28, 2026 by jluhrsen Contributor Loading…
DNM/TEST: Test udn settling sleep do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#31226 opened May 28, 2026 by jluhrsen Contributor Loading…
Contain exception OCPBUGS-65984 on two-node clusters do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31223 opened May 27, 2026 by hongkailiu Member Draft
OCPBUGS-86044: Use generated names in oc adm policy SCC test jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31221 opened May 27, 2026 by tchap Contributor Loading…
MCO-2319: Temporal OSImageStream dynamic call jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#31220 opened May 27, 2026 by pablintino Contributor Loading…
Add CNO test extension binary ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31218 opened May 27, 2026 by anuragthehatter Loading…
2 tasks
DNM: no-jira: fix egressfirewall test in aws dualstack jobs do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31217 opened May 26, 2026 by tthvo Member Loading…
Update ocdebug to ssh ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31216 opened May 26, 2026 by kasturinarra Contributor Loading…
NO-JIRA: Add stephenfin to OWNERS jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#31215 opened May 26, 2026 by stephenfin Loading…
OSASINFRA-4209: Add openstack-test OTE do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31214 opened May 26, 2026 by mandre Member Loading…
Add path to disable monitortest junit failures in spot check jobs, use etcd-scaling job as example approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#31212 opened May 25, 2026 by dgoodwin Contributor Loading…
MCO-2296: OSImageStreams v1 promotion jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. vendor-update Touching vendor dir or related files
#31211 opened May 25, 2026 by pablintino Contributor Loading…
fix: preserve gotest parser output for nested failures needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31210 opened May 25, 2026 by immanuwell Loading…
NO-JIRA: Remove fixed bugs on CO conditions (2) - 2nd try approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. verified Signifies that the PR passed pre-merge verification criteria
#31207 opened May 21, 2026 by hongkailiu Member Loading…
NO-JIRA: upkeep: add exception for expected disruption during tnf upgrade jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review verified Signifies that the PR passed pre-merge verification criteria
#31206 opened May 21, 2026 by eggfoobar Contributor Loading…
OCPBUGS-86473: Consolidate audit log must-gather tests to reduce parallel downloads and master node CPU pressure approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review verified Signifies that the PR passed pre-merge verification criteria
#31200 opened May 20, 2026 by xueqzhan Contributor Loading…
OCPEDGE-2606: e2e: add fencing credentials update and validation tests for dual-replica etcd approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31199 opened May 20, 2026 by fracappa Contributor Loading…
NO-ISSUE: Register cluster-baremetal-tests-ext in extension registry jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#31197 opened May 20, 2026 by jadhaj Loading…
ProTip! Exclude everything labeled bug with -label:bug.