Skip to content

Transition f. "Schedule Friday 0700" to "Add Update Label Weekly - ATO"#8518

Merged
t-will-gillis merged 4 commits intohackforla:gh-pagesfrom
t-will-gillis:transition-to-add-update-label-8517
Feb 20, 2026
Merged

Transition f. "Schedule Friday 0700" to "Add Update Label Weekly - ATO"#8518
t-will-gillis merged 4 commits intohackforla:gh-pagesfrom
t-will-gillis:transition-to-add-update-label-8517

Conversation

@t-will-gillis
Copy link
Member

@t-will-gillis t-will-gillis commented Feb 19, 2026

DO NOT REVIEW

Fixes #8517

What changes did you make?

  • Removed .github/workflows/schedule-fri-0700.yml,
  • Removed github-actions/trigger-schedule/add-update-label-weekly/add-label.js, and
  • Removed github-actions/trigger-schedule/add-update-label-weekly/update-instructions-template.md
  • Edited .github/workflows/add-update-label-weekly.yml for better dry-run behavior
  • Edited github-actions/workflow-configs/add-update-label-weekly-config.js to match current "Schedule Fri 0700"

Why did you make the changes (we will use this info to test)?

  • replaced by .github/workflows/add-update-label-weekly.yml previously installed
  • replaced by working files in ATO, using configs in github-actions/workflow-configs/add-update-label-weekly-config.js
  • replaced by github-actions/workflow-configs/templates/add-update-instructions-template.md

CodeQL Alerts

After the PR has been submitted and the resulting GitHub actions/checks have been completed, developers should check the PR for CodeQL alert annotations.

Check the PR's comments. If present on your PR, the CodeQL alert looks similar as shown

Screenshot 2024-10-28 154514

Please let us know that you have checked for CodeQL alerts. Please do not dismiss alerts.

  • I have checked this PR for CodeQL alerts and none were found.
  • I found CodeQL alert(s), and (select one):
    • I have resolved the CodeQL alert(s) as noted
    • I believe the CodeQL alert(s) is a false positive (Merge Team will evaluate)
    • I have followed the Instructions below, but I am still stuck (Merge Team will evaluate)
Instructions for resolving CodeQL alerts

If CodeQL alert/annotations appear, refer to How to Resolve CodeQL alerts.

In general, CodeQL alerts should be resolved prior to PR reviews and merging

Screenshots of Proposed Changes To The Website (if any, please do not include screenshots of code changes)

  • No visual changes

@github-actions
Copy link

Want to review this pull request? Take a look at this documentation for a step by step guide!


From your project repository, check out a new branch and test the changes.

git checkout -b t-will-gillis-transition-to-add-update-label-8517 gh-pages
git pull https://github.com/t-will-gillis/website.git transition-to-add-update-label-8517

@github-actions github-actions bot added Feature: Administrative Administrative chores etc. role: back end/devOps Tasks for back-end developers Feature: Board/GitHub Maintenance Project board maintenance that we have to do repeatedly Complexity: Small Take this type of issues after the successful merge of your second good first issue Feature: Refactor GHA Refactoring GitHub actions to fit latest architectural norms size: 0.25pt Can be done in 0.5 to 1.5 hours labels Feb 19, 2026
@t-will-gillis
Copy link
Member Author

Previously reviewed #8436

remove inline comment in yaml
@t-will-gillis t-will-gillis merged commit 944dbb0 into hackforla:gh-pages Feb 20, 2026
2 checks passed
@t-will-gillis t-will-gillis deleted the transition-to-add-update-label-8517 branch February 20, 2026 01:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Complexity: Small Take this type of issues after the successful merge of your second good first issue Feature: Administrative Administrative chores etc. Feature: Board/GitHub Maintenance Project board maintenance that we have to do repeatedly Feature: Refactor GHA Refactoring GitHub actions to fit latest architectural norms role: back end/devOps Tasks for back-end developers size: 0.25pt Can be done in 0.5 to 1.5 hours

Projects

Development

Successfully merging this pull request may close these issues.

Transition from "Schedule Friday 0700" to "Add Update Label Weekly - ATO"

1 participant