From 72045447ec33ee2f84a7e3138c29a38f9cc66bfc Mon Sep 17 00:00:00 2001 From: Michael Lindner Date: Thu, 26 Feb 2026 11:03:29 +0100 Subject: [PATCH 1/7] update source and description of "electricity grid connection" --- inputs/costs_PyPSA.csv | 3 --- inputs/manual_input.csv | 3 +++ outputs/US/costs_2020.csv | 6 +++--- outputs/US/costs_2025.csv | 6 +++--- outputs/US/costs_2030.csv | 6 +++--- outputs/US/costs_2035.csv | 6 +++--- outputs/US/costs_2040.csv | 6 +++--- outputs/US/costs_2045.csv | 6 +++--- outputs/US/costs_2050.csv | 6 +++--- outputs/costs_2020.csv | 6 +++--- outputs/costs_2025.csv | 6 +++--- outputs/costs_2030.csv | 6 +++--- outputs/costs_2035.csv | 6 +++--- outputs/costs_2040.csv | 6 +++--- outputs/costs_2045.csv | 6 +++--- outputs/costs_2050.csv | 6 +++--- 16 files changed, 45 insertions(+), 45 deletions(-) diff --git a/inputs/costs_PyPSA.csv b/inputs/costs_PyPSA.csv index 7fdc4d50..0ae7483c 100644 --- a/inputs/costs_PyPSA.csv +++ b/inputs/costs_PyPSA.csv @@ -183,9 +183,6 @@ central solar thermal,2030,lifetime,20,years,HP electricity distribution grid,2030,investment,500,EUR/kW,TODO electricity distribution grid,2030,lifetime,40,years,TODO electricity distribution grid,2030,FOM,2,%/year,TODO -electricity grid connection,2030,investment,140,EUR/kW,DEA -electricity grid connection,2030,lifetime,40,years,TODO -electricity grid connection,2030,FOM,2,%/year,TODO decentral oil boiler,2030,investment,156.0140915953699,EUR/kWth,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf) (+eigene Berechnung) decentral oil boiler,2030,lifetime,20.0,years,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf) decentral oil boiler,2030,FOM,2.0,%/year,Palzer thesis (https://energiesysteme-zukunft.de/fileadmin/user_upload/Publikationen/PDFs/ESYS_Materialien_Optimierungsmodell_REMod-D.pdf) diff --git a/inputs/manual_input.csv b/inputs/manual_input.csv index c49112ee..f9c97fac 100644 --- a/inputs/manual_input.csv +++ b/inputs/manual_input.csv @@ -1,4 +1,7 @@ technology,parameter,year,value,unit,currency_year,source,further_description +electricity grid connection,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion" +electricity grid connection,lifetime,2025,40,years,2020,same as 'electricity distribution grid', +electricity grid connection,FOM,2025,2,%/year,2020,same as 'electricity distribution grid', methanation,investment,2020,748,EUR/kW_CH4,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 6: “Reference scenario”.", methanation,lifetime,2020,20,years,2017,Guesstimate.,"Based on lifetime for methanolisation, Fischer-Tropsch plants." methanation,FOM,2020,3,%/year,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), section 6.2.3.1", diff --git a/outputs/US/costs_2020.csv b/outputs/US/costs_2020.csv index 66069c1e..874b6ef3 100644 --- a/outputs/US/costs_2020.csv +++ b/outputs/US/costs_2020.csv @@ -3946,9 +3946,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,, -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2025.csv b/outputs/US/costs_2025.csv index 6fab6887..6c3591de 100644 --- a/outputs/US/costs_2025.csv +++ b/outputs/US/costs_2025.csv @@ -4032,9 +4032,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,, -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9257,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.5263,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2030.csv b/outputs/US/costs_2030.csv index 78048c3b..5225bcfc 100644 --- a/outputs/US/costs_2030.csv +++ b/outputs/US/costs_2030.csv @@ -4188,9 +4188,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,, -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9269,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.6667,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2035.csv b/outputs/US/costs_2035.csv index 97241fc8..f9571077 100644 --- a/outputs/US/costs_2035.csv +++ b/outputs/US/costs_2035.csv @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,, -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9281,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.7484,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2040.csv b/outputs/US/costs_2040.csv index 4bd41637..3a362868 100644 --- a/outputs/US/costs_2040.csv +++ b/outputs/US/costs_2040.csv @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,, -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9292,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.8364,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2045.csv b/outputs/US/costs_2045.csv index 25145b8c..846c299c 100644 --- a/outputs/US/costs_2045.csv +++ b/outputs/US/costs_2045.csv @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,, -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9304,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.9164,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2050.csv b/outputs/US/costs_2050.csv index 30466033..9c9364ef 100644 --- a/outputs/US/costs_2050.csv +++ b/outputs/US/costs_2050.csv @@ -4212,9 +4212,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0,, -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9316,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,3.0,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/costs_2020.csv b/outputs/costs_2020.csv index 1dbe1cc7..ea14d979 100644 --- a/outputs/costs_2020.csv +++ b/outputs/costs_2020.csv @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0 -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2025.csv b/outputs/costs_2025.csv index bb26c697..0c4b4ee3 100644 --- a/outputs/costs_2025.csv +++ b/outputs/costs_2025.csv @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0 -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9257,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.5263,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2030.csv b/outputs/costs_2030.csv index aafd3b65..84b0f6a9 100644 --- a/outputs/costs_2030.csv +++ b/outputs/costs_2030.csv @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0 -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9269,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.6667,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2035.csv b/outputs/costs_2035.csv index 6b6cb09d..c19e21ec 100644 --- a/outputs/costs_2035.csv +++ b/outputs/costs_2035.csv @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0 -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9281,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.7484,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2040.csv b/outputs/costs_2040.csv index 61c88a65..572b9554 100644 --- a/outputs/costs_2040.csv +++ b/outputs/costs_2040.csv @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0 -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9292,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.8364,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2045.csv b/outputs/costs_2045.csv index 0a04f69e..bde10834 100644 --- a/outputs/costs_2045.csv +++ b/outputs/costs_2045.csv @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0 -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9304,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.9164,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2050.csv b/outputs/costs_2050.csv index f5570cf9..e2d223cd 100644 --- a/outputs/costs_2050.csv +++ b/outputs/costs_2050.csv @@ -975,9 +975,9 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,investment,187.0124,EUR/kW,DEA, from old pypsa cost assumptions,2015.0 -electricity grid connection,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 +electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 +electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9316,per unit,Stoichiometric calculation,, electrobiofuels,FOM,3.0,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, From a1e66398fce0b297c4bf6cfe825ec1c5c7b199aa Mon Sep 17 00:00:00 2001 From: Michael Lindner Date: Tue, 12 May 2026 14:16:42 +0200 Subject: [PATCH 2/7] change technology name --- inputs/manual_input.csv | 6 +++--- 1 file changed, 3 insertions(+), 3 deletions(-) diff --git a/inputs/manual_input.csv b/inputs/manual_input.csv index f9c97fac..6e0c5b6c 100644 --- a/inputs/manual_input.csv +++ b/inputs/manual_input.csv @@ -1,7 +1,7 @@ technology,parameter,year,value,unit,currency_year,source,further_description -electricity grid connection,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion" -electricity grid connection,lifetime,2025,40,years,2020,same as 'electricity distribution grid', -electricity grid connection,FOM,2025,2,%/year,2020,same as 'electricity distribution grid', +distribution grid reinforcement,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion" +distribution grid reinforcement,lifetime,2025,40,years,2020,same as 'electricity distribution grid', +distribution grid reinforcement,FOM,2025,2,%/year,2020,same as 'electricity distribution grid', methanation,investment,2020,748,EUR/kW_CH4,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 6: “Reference scenario”.", methanation,lifetime,2020,20,years,2017,Guesstimate.,"Based on lifetime for methanolisation, Fischer-Tropsch plants." methanation,FOM,2020,3,%/year,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), section 6.2.3.1", From 4a85fa6af3b39e561f64201a7a50d5b6e31889bc Mon Sep 17 00:00:00 2001 From: Michael Lindner Date: Tue, 12 May 2026 14:19:28 +0200 Subject: [PATCH 3/7] add release note --- docs/release_notes.rst | 2 ++ 1 file changed, 2 insertions(+) diff --git a/docs/release_notes.rst b/docs/release_notes.rst index 045e6af5..70476121 100644 --- a/docs/release_notes.rst +++ b/docs/release_notes.rst @@ -16,6 +16,8 @@ Upcoming Release .. The features listed below are not released yet, but will be part of the next release! .. To use the features already you have to use the ``master`` branch. +* Renamed "electricity grid connection" to "distribution grid reinforcement" and updated description for more clarity on the technology and consistency with the source. + `v0.14.0 `__ (13th February 2026) ================================================================================================ From 6d530d72261499d1e667c310bb081741372ee6ee Mon Sep 17 00:00:00 2001 From: Michael Lindner Date: Tue, 12 May 2026 14:22:04 +0200 Subject: [PATCH 4/7] typo --- inputs/manual_input.csv | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/inputs/manual_input.csv b/inputs/manual_input.csv index 6e0c5b6c..3c7c0b7d 100644 --- a/inputs/manual_input.csv +++ b/inputs/manual_input.csv @@ -1,5 +1,5 @@ technology,parameter,year,value,unit,currency_year,source,further_description -distribution grid reinforcement,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion" +distribution grid reinforcement,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)" distribution grid reinforcement,lifetime,2025,40,years,2020,same as 'electricity distribution grid', distribution grid reinforcement,FOM,2025,2,%/year,2020,same as 'electricity distribution grid', methanation,investment,2020,748,EUR/kW_CH4,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 6: “Reference scenario”.", From 3a489773a9712f8d2b347ec80d99d47cae3955c1 Mon Sep 17 00:00:00 2001 From: Michael Lindner Date: Tue, 12 May 2026 14:22:41 +0200 Subject: [PATCH 5/7] typo --- inputs/manual_input.csv | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/inputs/manual_input.csv b/inputs/manual_input.csv index 3c7c0b7d..841ce0e0 100644 --- a/inputs/manual_input.csv +++ b/inputs/manual_input.csv @@ -1,5 +1,5 @@ technology,parameter,year,value,unit,currency_year,source,further_description -distribution grid reinforcement,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)" +distribution grid reinforcement,investment,2025,150,EUR/kW,2020,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)" distribution grid reinforcement,lifetime,2025,40,years,2020,same as 'electricity distribution grid', distribution grid reinforcement,FOM,2025,2,%/year,2020,same as 'electricity distribution grid', methanation,investment,2020,748,EUR/kW_CH4,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 6: “Reference scenario”.", From 54842b475b142271f00fda14a663b5cb06040c21 Mon Sep 17 00:00:00 2001 From: Michael Lindner Date: Tue, 12 May 2026 14:25:14 +0200 Subject: [PATCH 6/7] run workflow and update outputs --- outputs/US/costs_2020.csv | 6 +++--- outputs/US/costs_2025.csv | 6 +++--- outputs/US/costs_2030.csv | 6 +++--- outputs/US/costs_2035.csv | 6 +++--- outputs/US/costs_2040.csv | 6 +++--- outputs/US/costs_2045.csv | 6 +++--- outputs/US/costs_2050.csv | 6 +++--- outputs/costs_2020.csv | 6 +++--- outputs/costs_2025.csv | 6 +++--- outputs/costs_2030.csv | 6 +++--- outputs/costs_2035.csv | 6 +++--- outputs/costs_2040.csv | 6 +++--- outputs/costs_2045.csv | 6 +++--- outputs/costs_2050.csv | 6 +++--- 14 files changed, 42 insertions(+), 42 deletions(-) diff --git a/outputs/US/costs_2020.csv b/outputs/US/costs_2020.csv index 57a36b0b..c6b82b54 100644 --- a/outputs/US/costs_2020.csv +++ b/outputs/US/costs_2020.csv @@ -3920,6 +3920,9 @@ direct firing solid fuels CC,VOM,0.4119,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0,, direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0,, direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0,, +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0,, +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0,, dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0,, dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0,, @@ -3952,9 +3955,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2025.csv b/outputs/US/costs_2025.csv index eb257c53..983ef649 100644 --- a/outputs/US/costs_2025.csv +++ b/outputs/US/costs_2025.csv @@ -4006,6 +4006,9 @@ direct firing solid fuels CC,VOM,0.415,EUR/MWh,"Danish Energy Agency, inputs/tec direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0,, direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0,, direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0,, +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0,, +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0,, dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0,, dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0,, @@ -4038,9 +4041,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9257,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.5263,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2030.csv b/outputs/US/costs_2030.csv index 9e2ca152..341c0ef6 100644 --- a/outputs/US/costs_2030.csv +++ b/outputs/US/costs_2030.csv @@ -4162,6 +4162,9 @@ direct firing solid fuels CC,VOM,0.4182,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0,, direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0,, direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0,, +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0,, +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0,, dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0,, dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0,, @@ -4194,9 +4197,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9269,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.6667,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2035.csv b/outputs/US/costs_2035.csv index a0b43b63..058be2d2 100644 --- a/outputs/US/costs_2035.csv +++ b/outputs/US/costs_2035.csv @@ -4186,6 +4186,9 @@ direct firing solid fuels CC,VOM,0.4198,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0,, direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0,, direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0,, +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0,, +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0,, dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0,, dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0,, @@ -4218,9 +4221,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9281,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.7484,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2040.csv b/outputs/US/costs_2040.csv index 32566132..5a089d87 100644 --- a/outputs/US/costs_2040.csv +++ b/outputs/US/costs_2040.csv @@ -4186,6 +4186,9 @@ direct firing solid fuels CC,VOM,0.4214,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0,, direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0,, direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0,, +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0,, +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0,, dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0,, dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0,, @@ -4218,9 +4221,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9292,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.8364,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2045.csv b/outputs/US/costs_2045.csv index a71821ec..d084637d 100644 --- a/outputs/US/costs_2045.csv +++ b/outputs/US/costs_2045.csv @@ -4186,6 +4186,9 @@ direct firing solid fuels CC,VOM,0.4214,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0,, direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0,, direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0,, +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0,, +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0,, dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0,, dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0,, @@ -4218,9 +4221,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9304,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,2.9164,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/US/costs_2050.csv b/outputs/US/costs_2050.csv index ce712410..402f4339 100644 --- a/outputs/US/costs_2050.csv +++ b/outputs/US/costs_2050.csv @@ -4186,6 +4186,9 @@ direct firing solid fuels CC,VOM,0.4214,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0,, direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0,, direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0,, +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0,, +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0,, dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0,, dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0,, @@ -4218,9 +4221,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0,, electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0,, -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0,, -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0,, -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0,, electrobiofuels,C in fuel,0.9316,per unit,Stoichiometric calculation,,,, electrobiofuels,FOM,3.0,%/year,combination of BtL and electrofuels,,2015.0,, electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,,,, diff --git a/outputs/costs_2020.csv b/outputs/costs_2020.csv index ea14d979..6476e14f 100644 --- a/outputs/costs_2020.csv +++ b/outputs/costs_2020.csv @@ -943,6 +943,9 @@ direct firing solid fuels CC,VOM,0.4119,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0 direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0 direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0 +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0 +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0 dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0 dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0 @@ -975,9 +978,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9245,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.4,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2025.csv b/outputs/costs_2025.csv index 0c4b4ee3..d2735a51 100644 --- a/outputs/costs_2025.csv +++ b/outputs/costs_2025.csv @@ -943,6 +943,9 @@ direct firing solid fuels CC,VOM,0.415,EUR/MWh,"Danish Energy Agency, inputs/tec direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0 direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0 direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0 +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0 +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0 dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0 dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0 @@ -975,9 +978,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9257,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.5263,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2030.csv b/outputs/costs_2030.csv index 84b0f6a9..68a01f4b 100644 --- a/outputs/costs_2030.csv +++ b/outputs/costs_2030.csv @@ -943,6 +943,9 @@ direct firing solid fuels CC,VOM,0.4182,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0 direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0 direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0 +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0 +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0 dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0 dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0 @@ -975,9 +978,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9269,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.6667,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2035.csv b/outputs/costs_2035.csv index c19e21ec..12d66d9b 100644 --- a/outputs/costs_2035.csv +++ b/outputs/costs_2035.csv @@ -943,6 +943,9 @@ direct firing solid fuels CC,VOM,0.4198,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0 direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0 direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0 +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0 +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0 dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0 dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0 @@ -975,9 +978,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9281,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.7484,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2040.csv b/outputs/costs_2040.csv index 572b9554..3f32961c 100644 --- a/outputs/costs_2040.csv +++ b/outputs/costs_2040.csv @@ -943,6 +943,9 @@ direct firing solid fuels CC,VOM,0.4214,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0 direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0 direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0 +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0 +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0 dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0 dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0 @@ -975,9 +978,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9292,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.8364,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2045.csv b/outputs/costs_2045.csv index bde10834..f74c8e67 100644 --- a/outputs/costs_2045.csv +++ b/outputs/costs_2045.csv @@ -943,6 +943,9 @@ direct firing solid fuels CC,VOM,0.4214,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0 direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0 direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0 +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0 +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0 dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0 dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0 @@ -975,9 +978,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9304,per unit,Stoichiometric calculation,, electrobiofuels,FOM,2.9164,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, diff --git a/outputs/costs_2050.csv b/outputs/costs_2050.csv index e2d223cd..7a66ae82 100644 --- a/outputs/costs_2050.csv +++ b/outputs/costs_2050.csv @@ -943,6 +943,9 @@ direct firing solid fuels CC,VOM,0.4214,EUR/MWh,"Danish Energy Agency, inputs/te direct firing solid fuels CC,efficiency,1.0,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","312.b Direct firing Sold Fuels: Total efficiency, net, annual average",2019.0 direct firing solid fuels CC,investment,278.5499,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Nominal investment,2019.0 direct firing solid fuels CC,lifetime,15.0,years,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.b Direct firing Sold Fuels: Technical lifetime,2019.0 +distribution grid reinforcement,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 +distribution grid reinforcement,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expansion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion)",2020.0 +distribution grid reinforcement,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 dry bulk carrier Capesize,FOM,4.0,%/year,"Based on https://www.hellenicshippingnews.com/capesize-freight-returns-below-operating-expense-levels-but-shipowners-reject-lay-ups/, accessed: 2022-12-03.","5000 USD/d OPEX, exchange rate: 1.15 USD = 1 EUR; absolute value calculate relative to investment cost.",2020.0 dry bulk carrier Capesize,capacity,180000.0,t,-,"DWT; corresponds to size of Capesize bulk carriers which have previously docked at the habour in Hamburg, Germany. Short of 200 kt limit for VLBCs.",2020.0 dry bulk carrier Capesize,investment,50293384.0456,EUR,"Based on https://www.hellenicshippingnews.com/dry-bulk-carriers-in-high-demand-as-rates-keep-rallying/, accessed: 2022-12-03.","See figure for ‘Dry Bulk Newbuild Prices’, Capesize at end of 2020. Exchange rate: 1.15 USD = 1 EUR.",2020.0 @@ -975,9 +978,6 @@ electric steam cracker,naphtha-input,14.8,MWh_naphtha/t_HVC,"Lechtenböhmer et a electricity distribution grid,FOM,2.0,%/year,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,investment,667.9016,EUR/kW,TODO, from old pypsa cost assumptions,2015.0 electricity distribution grid,lifetime,40.0,years,TODO, from old pypsa cost assumptions,2015.0 -electricity grid connection,FOM,2.0,%/year,same as 'electricity distribution grid',,2020.0 -electricity grid connection,investment,188.6002,EUR/kW,DEA - Technology Data Catalogue for el and DH - v17 - Page 15 - Paragraph 'Cost of grid expanion',"The costs of grid expansion from adding a new electricity generator or a new large consumer - related to strengthening or expansion of the local grid and/or substations (voltage transformation, pumping or compression/expansion",2020.0 -electricity grid connection,lifetime,40.0,years,same as 'electricity distribution grid',,2020.0 electrobiofuels,C in fuel,0.9316,per unit,Stoichiometric calculation,, electrobiofuels,FOM,3.0,%/year,combination of BtL and electrofuels,,2015.0 electrobiofuels,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015.01.006,, From 4ec4a344e2a3fb90cee954580848e5ecc713f64c Mon Sep 17 00:00:00 2001 From: Michael Lindner Date: Tue, 12 May 2026 14:26:12 +0200 Subject: [PATCH 7/7] add breaking warning --- docs/release_notes.rst | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-) diff --git a/docs/release_notes.rst b/docs/release_notes.rst index 3af58929..7f63ccd7 100644 --- a/docs/release_notes.rst +++ b/docs/release_notes.rst @@ -16,7 +16,8 @@ Upcoming Release .. The features listed below are not released yet, but will be part of the next release! .. To use the features already you have to use the ``master`` branch. -* Renamed "electricity grid connection" to "distribution grid reinforcement" and updated description for more clarity on the technology and consistency with the source. +* Breaking changes: + - Renamed "electricity grid connection" to "distribution grid reinforcement" and updated description for more clarity on the technology and consistency with the source. * Add missing discount rate for OCGT in US-specific data. (https://github.com/PyPSA/technology-data/pull/269)